Progress Update: Week 3

This week the crew finished up the rest of the demolition.  With demolition taking so long, it feels like this project isn't getting anywhere.  Things feel as though they've slowed to a snail's pace.
The old plaster & lath wall in the back bedroom comes down.

The rest of the old closet wall in the back bedroom came down and the new wall for the bedroom closet and the laundry closet was framed.
Bumping out the old closet wall and dividing the space in two to create a dedicated place for laundry.

New framed wall between the kitchen and hall.

Plumbing for the sink, refrigerator, and future 2nd floor master bathroom (not this renovation project!) was roughed in.  A new gas meter sized for the incoming tankless water was also installed.
New electrical is installed and water lines for a future 2nd floor master bathroom are roughed in.